EXXONMOBIL Antwerp Refinery – Fireproofing
Fireproofing for the Anwerup EPC2 project at the Exxon Mobil refinery in Antwerp (Belgium)
Fireproofing for the Anwerup EPC2 project at the Exxon Mobil refinery in Antwerp (Belgium)
Civil and fire protection works of metal structures at the Exxon Mobil refinery in Antwerp (Belgium).
Civil works include the construction of foundations, elevated structures and supports in reinforced concrete for various parts of the plant, industrial floors, grounding systems and construction of colored concrete castings for the detection of plant ducts.
The fire protection of steel structures was achieved through the application of the Pyrocrete® system and the MasterEmaco® system, specifically designed for passive fire protection in buildings and industry in accordance with UL regulations.
CLIENT: IREM S.p.A.
PLACE: Antwerp – Belgium
START OF THE WORK: 05/2017
END OF THE WORK: 12/2017
WORK AMOUNT: € 4.300.000
SURFACE TREATED: 3000 mc