S/S 150 ELECTRICAL SUBSTATION- ESSO REFINERY

Design and construction of an electrical substation for the Cogeneration Plant of the Esso Refinery - Cogen Project Augusta (SR)

https://www.solesi.it/wp-content/uploads/2017/02/20121205_153007-sito.jpg
https://www.solesi.it/wp-content/uploads/2017/02/P3070066-copia.jpg

Project: S/S 150 ELECTRICAL SUBSTATION- ESSO REFINERY

Title:

Description:

S/S 150 ELECTRICAL SUBSTATION- ESSO REFINERY

Design and construction of an electrical substation for the Cogeneration Plant of the Esso Refinery - Cogen Project Augusta (SR)

https://www.solesi.it/wp-content/uploads/2017/02/20121205_153007-sito-1080x1080.jpg
https://www.solesi.it/wp-content/uploads/2017/02/P3070066-copia-1080x1080.jpg
OLYMPUS DIGITAL CAMERA

Job description

Design and construction of the S / S150 substation, external dimensions: 10 × 22.5 m in plan and 10 m in height, located in the area of the 0163 S / S150 plant. For this project, the following activities have been carried out:

  • Architectural design and detailed engineering;
  • Assembly of metal carpentry;
  • Execution of civil works;
  • Realization of electrical system;
  • Realization of HVAC system;
  • Installation of crane.

CLIENT: Foster Wheeler Italiana SRL
PLACE: Augusta (SR)
START OF THE WORK: 10/2012
END OF THE WORK: 08/2013
WORK AMOUNT: € 667.000

Sede legale

Via Stentinello, 9 int. 13
96100 Siracusa
Tel.: 0931/751411
Fax: 0931/756944
Email: solesi@solesi.it

Sede commerciale

Via Carlo De Angeli, 3
20141 Milano Tel.: 02/6694125
Fax: 02/6694145
Email: solesi.milano@solesi.it

Branch estere

Belgium Branch - Brussels
Denmark Branch - Roskilde
France Branch - Lyon
Poland Branch - Poznan
Slovakia Branch - Bratislava

Gruppo irem

Via Stentinello, 9
96100 Siracusa
Tel.: 0931/787011
Fax: 0931/756875
Email: irem@iremspa.it