Marcinelle CCGT Power Plant – Civil works
Main and secondary civil works for the realization of the CCGT Plant of Marcinelle (Charleroi) in Belgium.
Main works:
Excavations, embankments and earth movements, foundations and structures in reinforced concrete for buildings, foundations for pipe-racks and metal structures, basins, foundations for systems, various foundations and for tanks, grouting, doors and windows, hydro-sanitary systems, underground networks, road works, earth networks, outdoor lighting, electrical systems buildings, telephone systems, data transmission and television circuit systems, lifting systems and lifts.
Secondary and finishing civil works:
Landscaping and green works, excavations, embankments and earth movements, foundations and structures in reinforced concrete, construction of roads and yards, underground networks, fences and gates.
CLIENT: ENEL S.p.A.
PLACE: Mercinelle Chrleroi – Belgium
START OF THE WORK: 03/2009
END OF THE WORK: 10/2011
WORK AMOUNT: € 13.740.000
CONCRETE CASTINGS: 15.000 mc
REINFORCING STEEL: 1.300.000 kg