ITALGAS RETI S.P.A. MUNICIPALITY OF IMPERIA
Gas network conversion works from LPG to natural gas.
Extension of the gas network and conversion of the existing network fueled by LPG into a natural gas network, in the municipality of Imperia (IM) in the Montegrazie area and in the Moltedo hamlet.
Works carried out by Solesi:
1. Excavation and removal of the pavement.
2. Welding, backfilling and temporary restoration.
3. Testing and putting in gas.
4. Works on existing network and remediation of LPG areas.
5. Restoration of paving and road signs.
The contract envisaged the extension of the existing network in order to create a gas network connecting the Montegrazie locality and the Moltedo hamlet of the same municipality, and to convert the same networks fueled by LPG and networks fueled by Natural Gas. The overall length of the network involved in the interventions is 9331 m.
CLIENT: ITALGAS RETI S.P.A.
PLACE: Municipality of Imperia
START OF THE WORK: 02/01/2019
END OF THE WORK: 30/04/2020
WORK AMOUNT: 2.215.000
MAN HOURS: 40.000
EXTENSION OF THE GAS NETWORK: For a length of 9.3 KM